NEHEMIAH PROJECT UPDATE #25
March 31, 2009
The following pictures show
preparations for finishing the walls and ceilings. Wires
and tubes have been installed. Pictures 3 and 4 show the
auditorium area. Pictures 5 and 6 are of the hallway of
classroms down from the auditorium on the main floor. The
last few pictures are of the basement rooms.











